Thursday, April 15, 2010

Bore Gauge Maintenance

Standard maintenance of the gauge should be performed every 3 months or 1,000 bore measurements. Please do not attempt to disassemble your bore gauge.

The Following routine maintenance is suggested every 3 months :
  • Check the extent of flats on shoe contacts

  • Clean, polish or turn the balls, whichever is applicable, or replace

  • Examine abnormal angular play between shoe and bottom section, replace the shoe

  • Examine bell crank for wear or damage on edge of ground face and replace if necessary

  • Examine the top plunger for wear and/or damage

  • Clean and oil all parts carefully

Related Post



No comments:

Post a Comment