Showing posts with label Bore Gauge Maintenance. Show all posts
Showing posts with label Bore Gauge Maintenance. Show all posts

Thursday, April 15, 2010

Bore Gauge Maintenance

Standard maintenance of the gauge should be performed every 3 months or 1,000 bore measurements. Please do not attempt to disassemble your bore gauge.

The Following routine maintenance is suggested every 3 months :
  • Check the extent of flats on shoe contacts

  • Clean, polish or turn the balls, whichever is applicable, or replace

  • Examine abnormal angular play between shoe and bottom section, replace the shoe

  • Examine bell crank for wear or damage on edge of ground face and replace if necessary

  • Examine the top plunger for wear and/or damage

  • Clean and oil all parts carefully